A walk-in acoustic enclosure with forced ventilation, observation windows and protected process piping
For high-energy industrial rooms, acoustic performance cannot be separated from heat removal and safety. The enclosure, silencer sizing, forced ventilation and temperature control were developed together.
Project Profile
|
Location |
Ningxia, China |
|
Industry |
Coal chemical and energy production |
|
Primary noise sources |
Gas turbine, air compressors, booster compressors and process piping in compressor rooms |
|
Baseline condition |
Approximately 105-113 dB(A) in the operating areas |
|
Applicable standard or target |
GBZ 2.2-2007 occupational exposure limits; target noise outside the treatment at 1 m ≤ 85 dB(A) |


Project Challenge
The equipment generated high continuous noise and substantial heat. The enclosure had to provide a safe working environment while preserving operator access, thermal control, explosion-protection requirements and visibility of the equipment.
Engineered Solution
- Built a walk-in composite acoustic enclosure around the air compressor, turbine and booster compressor groups, with internal circulation space.
- Added multiple 1 m x 2 m acoustic doors rated at ≥ 30 dB for inspection and maintenance.
- Installed 12 intake and 12 exhaust silencer units, each approximately 1500 x 1000 x 1500 mm, designed for ≥ 25 dB attenuation and arranged for lower-inlet and upper-exhaust convection.
- Added explosion-protected axial fans and an automatic temperature-sensing control system to regulate ventilation.
- Installed 24 double laminated tempered acoustic observation windows rated at ≥ 20 dB.
- Wrapped process piping with a three-layer system combining thermal insulation, acoustic treatment and mechanical protection.
Performance Targets And Results
|
Metric |
Target or value |
Project interpretation |
|
Work-area noise target |
≤ 85 dB(A) at 1 m outside the treatment |
Occupational-health target |
|
Enclosure insertion loss |
Approximately 20-28 dB(A) |
Design performance range |
|
Safety and operation |
Ventilation and explosion-protection requirements maintained |
Normal production preserved |