Project Profile

 

Location

Nanjing, China

Industry

Medical and biotechnology equipment

Primary noise sources

Five negative-pressure fans serving the production area

Baseline condition

Approximately 82 dB(A) measured around the operating equipment

Applicable standard or target

Project target outside the enclosure at 1 m: ≤ 70 dB(A)

info-600-450
Before Treatment
-
After Treatment

 

Project Challenge

 

The fans were installed in an active production environment, so the retrofit had to be compact, quick to assemble and easy to reopen for equipment maintenance. The original fan openings also had to remain functional.

 

Engineered Solution

 

  • Designed five individual acoustic enclosures using 50 mm composite sound-absorbing and sound-insulating modules manufactured in the factory for rapid site assembly.
  • Used a 1.5 mm 304 stainless-steel outer skin, damping acoustic layer, 50 mm acoustic wool sealed with glass-fiber facing cloth and 0.6 mm perforated aluminum inner facing.
  • Added a compact axial-fan exhaust system to remove heat and maintain normal equipment operation.
  • Designed removable roof sections for equipment inspection and maintenance.
  • Connected the enclosure intake and exhaust openings to the existing fan openings without obstructing the fan duty point.
  • Applied professional acoustic sealing around pipe and duct penetrations to prevent leakage.

 

Performance Targets And Results

 

Metric

Target or value

Project interpretation

Noise outside the enclosure

≤ 70 dB(A) at 1 m

Project target

Enclosure insertion loss

≥ 12 dB(A)

Design target

Installation

Assembly completed within two days

Limited impact on production

 